How Long Does a 40 kVA UPS Work? Duration Table and Calculation

How Long Does a 40 kVA UPS Work? Duration Table and Calculation

40 kVA UPS; It is used for medium-sized factories, hospital floors, hotel and shopping mall technical rooms, large office blocks and data rooms. At this power, the DC current reaches 100 amps and the duration depends on both the battery capacity and the quality of the battery wiring. In this article, we explained the duration table, calculation method and the maximum amount of battery that can be connected to the UPS.

Short answer

The DC voltage of a 40 kVA UPS is usually 480 V (40 x 12 V batteries). Some models use 384 V (32 batteries). Refer to the label and data sheet for the number of batteries. Approximate times with a 480 V group:

  • Full load (approx. 65 W) with 36000 Ah batteries: 20 minutes
  • Full load with 100 Ah batteries: 35 minutes
  • At half load (approx. 18000 W) with 100 Ah batteries: approx. 1 hour and 25 minutes
  • At full load with 200 Ah batteries: approx. 1 hour and 25 minutes

How many watts does a 40 kVA UPS carry?

  • In a UPS with a power factor of 0.9, 40 kVA is approximately 36000 W does.
  • In the new generation model with a power factor of 1,0 40000 W does.
  • In the old model with a power factor of 0.8 32000 W does.

The power factor is written in the data sheet. See What is Power Factor?.

Forty 12V UPS batteries stacked in two-story rack and connected in series

Time table for 40 kVA UPS (40 x 12 V batteries, 480 V DC)

Durations for new VRLA/AGM battery, 25 °C and 0.9 power factor and 90% UPS efficiency They are rough calculations. The actual time may deviate by 20-30% ± depending on the model.

Ah on each batteryFull load (36000 W)75% load (27000 W)Half load (18000 W)25% load (9000 W)
40 Ah10 min15 min26 min1 hr 5 min
65 Ah20 min29 min49 min2 h
100 Ah35 min51 min1 hr 27 min3 hr 30 min
150 Ah59 min1 hr 27 min2 hr 25 min5 hr 35 min
200 Ah1 hr 27 min2 hr 5 min3 hr 30 min7 hr 45 min

384V (32 cord) version times are shorter. For example, you get about 15 minutes at full load with 65 Ah batteries, about 26 minutes with 100 Ah batteries, and about 1 hour and 5 minutes with 200 Ah batteries. Because more current is drawn from each battery.

Hospital floor and technical room protected by UPS

Example calculation: 24000 W load at the factory

In a factory, control panels, servers, security and lighting systems draw a total of 24000 W. UPS 480 V, there are 40 100 Ah batteries in the battery cabinet.

  1. Battery energy: 40 × 12 V × 100 Ah = 48000 Wh.
  2. Current: 24000 ÷ (0.9 × 40 × 11.5 V) = approximately 58 A.
  3. C-rate: 58 ÷ 100 = approximately 0.58.
  4. Available rate: Since the C-ratio is between 0.5-1, it is 0.50 (for the ratio table 1 kVA inscription see).
  5. Duration: 48000 × 0.50 ÷ 24000 = 1 hour, so about 60 minutes.

Same calculation with 65 Ah batteries approx. 39 min gives. So 100 Ah is required for the 1 hour target.

For load analysis and correct determination of the time target, see. UPS and Battery Capacity Project Design and How to Calculate the Cost of a Power Outage to the Business?.

Technician checking battery pole connection with insulating torque wrench

What is the maximum amount of battery connected to a 40 kVA UPS?

The number of batteries is fixed

40 batteries are connected in series with the 480 V model and 32 with the 384 V model in series. You cannot change this number. To extend the time, batteries with larger Ah are switched or parallel is added from the same array. The number of parallel strings is usually limited to 2-4. Refer to the manufacturer's data sheet. See What is a Battery String?.

Charging current is the most important limit

At this power, the charging current is usually around 10-20 A in standard models. In long-run models, it can be 30-40 A or above. The exact value is in the data sheet.

Rule: Ah = charging current × 10 (comfortable) to 20 × (limit).

UPS charging currentRecommended maximum battery (Ah)Full charge time (roughly)
10 A100-200 Ah12-24 hours
20 A200-400 Ah12-24 hours
30 A300-600 Ah12-24 hours
40 A400-800 Ah12-24 hours

Rough charging time: Ah × 1.2 ÷ charging current (hours). For 100 Ah in the factory example above, 5-10 A is sufficient. For a batch of 200 Ah, at least 10-20 A is recommended.

DC current, cable and protection

At full load, the DC current is approximately 87 A in the 480 V model and approximately 109 A in the 384 V model. At this level, the cable cross-section, DC fuse and switch selection should be made calculatedly. Insufficient cross-section leads to heating and loss of time.

Weight and area

40 12 V 100 Ah batteries hold approximately 1150-1250 kg, 40 12 V 200 Ah batteries hold approximately 2300-2500 kg. For these weights, the floor load and shelf carrying capacity must be checked. See. Lithium Battery Cabinet Installation: Layout, Ventilation, and Safety Distances (written for lithium, the principles of settlement are similar).

Highest Ah battery

The practical upper limit for single-block 12 V batteries is around 200 Ah. Larger capacities use 2 V cells (OPzV/OPzS). 480 V requires 240 cells. See What is OPzS and OPzV Battery?.

Security: 384-480 V DC is life-threatening. Battery addition, cabin connection and fuse works are the work of authorized personnel.

Redundancy in a 40 kVA UPS

If an interruption in this power is unacceptable, two UPSs are run in parallel instead of a single UPS (N+1). If one fails, the other carries the load. See What is Redundancy in UPS? and Parallel UPS Installation and Load Sharing. If the burden will grow Modular UPS solution. For three-phase structure Differences Between Three-Phase and Single-Phase UPS See the article.

Summary for all kVA classes on one page: How Long Does a UPS Work? kVA Guide

Frequently Asked Questions

01Does a 40 kVA UPS work for 1 hour?
With 100 Ah batteries at a load of up to 18000 W, you get about 1 hour and 25 minutes. For 1 hour at full load, you need about 150 Ah per battery.
02How many batteries are needed for a 40 kVA UPS?
It depends on the DC voltage of the UPS. 40 x 12V batteries are used in the 480 V model and 32 x 12 batteries are used in the 384 V model. See label and data sheet.
03Do I need a generator?
If there is a target of running longer than 1-2 hours at full load, the generator is often more economical. See Differences Between UPS and Generator.
04How do I verify duration?
The most reliable method is the discharge test. See Discharge and Load Tests.