How Long Does a 30 kVA UPS Work? Duration Table and Calculation
30 kVA UPS; It is used for small factories, building automation, data rooms, hospital departments and critical office floors. At this power, the UPS is almost always three-phase and the battery pack consists of 32-40 12 V batteries. How many minutes or hours the UPS will work depends entirely on the size of the battery cabinet. In this article, we explained the time table, calculation method and the maximum amount of battery that can be connected to the UPS.
Short answer
The DC voltage of a 30 kVA UPS is usually 384 V (32 x 12 V batteries) or 480 V (40 x 12 V batteries). Refer to the label and data sheet for the number of batteries. Approximate times with a 384 V group:
- At full load (approx. 27000 W) with 65 Ah batteries: 20-25 minutes
- At full load with 100 Ah batteries: 35-40 minutes
- At half load (approx. 13500 W) with 100 Ah batteries: approx. 1 hour 30 minutes
- At half load with 200 Ah batteries: approx. 3 hours 45 minutes
The standard battery range at this power is between 65-200 Ah.
How many watts does a 30 kVA UPS carry?
- A power factor of 0.9 in a UPS has a 30 kVA approx. 27000 W does.
- In the new generation model with a power factor of 1,0 30000 W does.
- In the old model with a power factor of 0.8 24000 W does.
The power factor is written in the data sheet. See What is Power Factor?.

Time table for 30 kVA UPS (32 x 12 V batteries, 384 V DC)
Durations for new VRLA/AGM battery, 25 °C and 0.9 power factor and 90% UPS efficiency They are rough calculations. The actual time may deviate by 20-30% ± depending on the model.
| Ah on each battery | Full load (27000 W) | 75% load (20250 W) | Half load (13500 W) | 25% load (6750 W) |
|---|---|---|---|---|
| 40 Ah | 11 min | 17 min | 29 min | 1 hr 10 min |
| 65 Ah | 22 min | 32 min | 54 min | 2 hr 10 min |
| 100 Ah | 38 min | 55 min | 1 hr 35 min | 3 hr 45 min |
| 150 Ah | 1 hr 5 min | 1 hr 35 min | 2 hr 40 min | 6 h |
| 200 Ah | 1 hr 35 min | 2 hr 15 min | 3 hr 45 min | 8 hr 20 min |
On 480V (40 cord) version times are longer. For example, you get about 29 minutes at full load with 65 Ah batteries, about 51 minutes with 100 Ah batteries, and about 2 hours and 5 minutes with 200 Ah batteries. The reason is that less current is drawn from each battery. Therefore, the number of batteries is one of the questions to be asked when choosing a UPS.
Example calculation: 18000 W load in the plant
Servers, control panels, security systems and office load in a facility draw a total of 18000 W. UPS 384 V, there are 32 100 Ah batteries in the battery cabinet.
- Battery energy: 32 × 12 V × 100 Ah = 38400 Wh.
- Current: 18000 ÷ (0.9 × 32 × 11.5 V) = approximately 54.3 A.
- C-rate: 54.3 ÷ 100 = approximately 0.54.
- Available rate: Since the C-ratio is between 0.5-1, it is 0.50 (for the ratio table 1 kVA inscription see).
- Duration: 38400 × 0.50 ÷ 18000 = 1.07 hours, so about 64 minutes.
If you do the same calculation for 65 Ah, you can do about 42 min comes out. So 100 Ah is required for the 1 hour target.
Load analysis is essential for the correct sizing of the investment at this power. See UPS and Battery Capacity Project Design.

What is the maximum amount of battery connected to a 30 kVA UPS?
The number of batteries is fixed
32 batteries are connected in series for the 384 V model and 40 for the 480 V model 12 V batteries. You cannot change this number. To extend the time, switch to batteries with larger Ah or add parallel from the same array. The number of parallel strings is usually limited to 2-4. Refer to the manufacturer's data sheet. See What is a Battery String?.
Charging current is the most important limit
At this power, the charging current is usually around 10 A in standard models. In long-run models, it can be 20-40 A or above. The exact value is in the data sheet.
Rule: Ah = charging current × 10 (comfortable) to 20 × (limit).
| UPS charging current | Recommended maximum battery (Ah) | Full charge time (roughly) |
|---|---|---|
| 10 A | 100-200 Ah | 12-24 hours |
| 20 A | 200-400 Ah | 12-24 hours |
| 30 A | 300-600 Ah | 12-24 hours |
| 40 A | 400-800 Ah | 12-24 hours |
Coarse charging time: Ah × 1.2 ÷ charging current (hours). For 100 Ah in the above plant example, 5-10 A is sufficient. For a group of 200 Ah, at least 10-20 A is recommended.
DC current, cable and protection
At full load, the DC current is approximately 82 A in the 384 V model and approximately 65 A in the 480 V model. At this level, the cable cross-section, DC fuse and switch selection should be made calculatedly. Insufficient cross-section leads to heating and loss of time.
Weight and area
32 12 V 100 Ah batteries hold approximately 900-1000 kg, 40 12 V 65 Ah batteries approximately 800 kg. Floor load, cabinet size, and ventilation should be checked before installation. See Lithium Battery Cabinet Installation: Layout, Ventilation, and Safety Distances (written for lithium, the principles of settlement are similar).
Highest Ah battery
The practical upper limit for single block 12 V batteries is around 200 Ah. Larger capacities use 2 V cells (OPzV/OPzS). See What is OPzS and OPzV Battery?.
Security: 384-480 V DC is life-threatening. Battery addition, cabin connection and fuse works are the work of authorized personnel.

30 kVA UPS is three-phase
30 kVA UPSs are mostly 3 phase input, 3 phase output (3/3). Some models also have a 3/1 option. See Differences Between Three-Phase and Single-Phase UPS and Differences Between Transformered and Transformerless UPS.
Growth and redundancy
For critical loads, a parallel UPS (N+1) is preferred over a single UPS. If one fails, the other carries the load. See What is Redundancy in UPS? and Parallel UPS Installation and Load Sharing. If there is an expectation of growth Modular UPS is also an option.
Summary for all kVA classes on one page: How Long Does a UPS Work? kVA Guide
Frequently Asked Questions
01Will a 30 kVA UPS run for 1 hour?
02How much space do the batteries of a 30 kVA UPS take up?
03Do I need a generator?
04How do I verify duration?
Let's Choose the Right UPS Together
Tell us your load and the time you want, and we will determine the UPS power, battery cabinet and capacity together. Our three-phase online UPS models or You can contact us.