How Long Does a 1000 kVA UPS Work? Duration Table and Calculation
1000 kVA (1 MVA) level; It is a multi-unit UPS system installed for hyperscale data centers, large hospital campuses, refineries, airports and large industrial facilities. At full load, the total DC current exceeds 2000 amperes. At this scale, the battery system is as large as a building section. In this article, we explained the time table, calculation method and the maximum amount of battery that can be connected to the system.
Short answer
The battery bank of a 1000 kVA UPS system is usually 480 V DC (40 12 V blocks or 240 2 V cells). Some manufacturers use different voltages, such as 576 V. A single battery string is not enough at this power. More than one string is connected in parallel and the time is total Ah value determined accordingly. In this article, all times are given over the total Ah. Approximate times:
- At full load (approx. 900000 W) with a total of 4000 Ah: approx. 1 hour and 5 minutes
- At full load with a total of 6000 Ah: approx. 1 hour and 50 minutes
- At half load (approx. 450000 W) with a total of 6000 Ah: approx. 4 hours and 20 minutes
- At full load with a total of 10000 Ah: approx. 3 hours 30 minutes
The calculations were made with 90% efficiency and 0.9 power factor. Since the efficiency of the new generation large UPSs is higher, the actual times may be a little longer. In most projects, the target time is 10-30 minutes. This time acts as a bridge until the generator is activated.
How many watts does a 1000 kVA UPS carry?
- In the system with a power factor of 0.9, 1000 kVA is approximately 900000 W does.
- In the new generation model with a power factor of 1,0 1000000 W does.
- In the old model with a power factor of 0.8 800000 W does.
The power factor is written in the data sheet. See What is Power Factor?.

Time table for 1000 kVA UPS (480 V DC, total Ah)
Durations for new VRLA/AGM battery (2 V cell), 25 °C and 0.9 power factor and 90% UPS efficiency They are rough calculations. The actual time may deviate by 20-30% ± depending on the model. "Total Ah" is the sum of the Ah values of all 480 V arrays connected in parallel.
| Total battery capacity | Full load (900000 W) | 75% load (675000 W) | Half load (450000 W) | 25% load (225000 W) |
|---|---|---|---|---|
| 3000 Ah | 44 min | 1 hr 5 min | 1 hr 50 min | 4 hr 20 min |
| 4000 Ah | 1 hr 5 min | 1 hr 34 min | 2 hr 40 min | 6 h |
| 6000 Ah | 1 hr 50 min | 2 hr 40 min | 4 hr 20 min | 9 hr 30 min |
| 8000 Ah | 2 hr 40 min | 3 hr 45 min | 6 h | Over 12 h |
| 10000 Ah | 3 hr 30 min | 4 hr 50 min | 7 hr 45 min | Over 12 h |
The calculation loses its reliability for periods above 12 hours. A generator solution is used for such a long time at this power.

Example calculation: 720000 W load on data center campus
Several server halls, storage systems, network core and cooling control in a data center campus draw a total of 720000 W. The UPS system has 480 V DC input, the total battery capacity is 5000 Ah.
- Battery energy: 480 V × 5000 Ah = 2400000 Wh.
- Current: 720000 ÷ (0.9 × 40 × 11.5 V) = approximately 1739 A (sum of all sequences).
- C-rate: 1739 ÷ 5000 = approximately 0.35.
- Available rate: Since the C-ratio is between 0.2-0.5, 0.60 (for the ratio table 1 kVA inscription see).
- Duration: 2400000 × 0.60 ÷ 720000 = 2.0 hours, so about 120 minutes.
If the goal is 3 hours and 15 minutes, repeat with the group of 8000 Ah total: Wh = 3840000, C-ratio approx. 0.22, proportion 0.60. Duration = 3840000 × 0.60 ÷ 720000 = approx 192 minutes.
For load analysis, see. UPS and Battery Capacity Project Design.

What is the maximum amount of battery connected to a 1000 kVA UPS?
The number of batteries is fixed, the number of parallel strings is limited
Each string connects 240 2 V cells (480 V) in series. You cannot change this number. To extend the time, the cell Ah value is increased or a parallel array is added. At this scale, the battery system can consist of dozens of parallel strings. Each string has a separate fuse and monitoring system. The highest number of parallel strings in the manufacturer's data sheet and the total Ah limit must be observed. See What is a Battery String?.
Charging current is the most important limit
At this power, the charging current is not provided by a single circuit. The charging circuit of each UPS unit is collected or a separate charging rectifier is added. The exact value is in the data sheet.
Rule: Ah = charging current × 10 (comfortable) to 20 × (limit).
| Total charging current | Recommended maximum total battery (Ah) | Full charge time (roughly) |
|---|---|---|
| 100 A | 1000-2000 Ah | 12-24 hours |
| 200 A | 2000-4000 Ah | 12-24 hours |
| 400 A | 4000-8000 Ah | 12-24 hours |
| 800 A | 8000-16000 Ah | 12-24 hours |
Coarse charging time: Ah × 1.2 ÷ charging current (hours). In the example above, a total charging current of 250-500 A is required for 5000 Ah, and 400-800 A for 8000 Ah.
DC current, busbar and protection
The total DC current at full load is approximately 2174 A. This current does not flow through a single string. Each string must have its own DC fuse and switch. Copper bus sections, short circuit resistance, and bus distances require project engineering.
Weight, space and ventilation
A group of 2 V cells of 480 V weighs roughly 15 kg × AAh. For example, 6000 Ah costs about 90 tons, 10000 Ah about 150 tons. For these weights, the floor load and rack load-bearing capacity must be verified by static calculation before installation. Ventilation, temperature and fire safety in the battery room are planned separately. See Factors Affecting Battery Life.
Lithium option
If space and weight are a problem, a lithium battery is also an option. See Lithium-Ion UPS Batteries and What is Thermal Runaway? How to Prevent It in Batteries?. For 2 V cells, see V. What is OPzS and OPzV Battery?.
Security: 480 V DC is life-threatening. Battery addition, connection and insurance are the work of authorized personnel.
Is 1000 kVA a single UPS or a system?
It is very rare to solve 1000 kVA with a single UPS. Typical solutions are five 250 kVA, four 300 kVA or modular construction. In most projects, N+1 or 2N architecture is installed. Battery room, cooling, fire extinguishing and maintenance access are treated as an engineering project, independent of the UPS. Lithium battery and monitoring system are also a serious option at this scale. See What is a Modular UPS?, What is Redundancy in UPS?, Parallel UPS Installation and Load Sharing and UPS Architecture in Data Centers.
Frequently Asked Questions
01Does a 1000 kVA UPS run for 1 hour?
02Is a battery room required for a 1000 kVA UPS?
03Do I need a generator?
04How do I verify duration?
Let's Choose the Right UPS Together
Tell us your load and the desired time, and we will determine the UPS system, battery pack and battery room requirements together. Our three-phase online UPS models or You can contact us.