How Long Does a 15 kVA UPS Work? Duration Table and Calculation
15 kVA UPS; It is used in floor-based office protection, laboratories, control panels of small production lines and rooms with several servers. The duration of the UPS at this power depends almost entirely on the selected battery cabinet. Small batteries of 9 Ah are practically no longer used, because they only last a few minutes at full load. In this article, we explained the time table, the calculation method and the maximum amount of batteries that can be connected to the UPS.
Short answer
The DC voltage of a 15 kVA UPS is usually 240 V (20 x 12 V batteries). Some three-phase models go up to 360-480 V. Refer to the label and data sheet for the number of batteries. Approximate times with a 240 V group:
- At full load with 9 Ah batteries: 2-3 minutes (therefore practically unused)
- At full load (approx. 13500 W) with 26 Ah batteries: 8-10 minutes
- At half load (approx. 26 W) with 6750 Ah batteries: 20-25 minutes
- At half load with 65 Ah batteries: approx. 1 hour 10 minutes
How many watts does a 15 kVA UPS carry?
- 15 kVA in a UPS with a power factor of 0.9 is approximately 13500 W does.
- In the model with a power factor of 1.0 15000 W does.
- In the old model with a power factor of 0.8 12000 W does.
The power factor is written in the data sheet. See What is Power Factor?.

Time table for 15 kVA UPS (20 x 12 V batteries, 240 V DC)
Durations for new VRLA/AGM battery, 25 °C and 0.9 power factor and 90% UPS efficiency They are rough calculations. The actual time may deviate by 20-30% ± depending on the model.
| Ah on each battery | Full load (13500 W) | 75% load (10125 W) | Half load (6750 W) | 25% load (3375 W) |
|---|---|---|---|---|
| 26 Ah | 9 min | 13 min | 22 min | 54 min |
| 40 Ah | 15 min | 23 min | 38 min | 1 hr 35 min |
| 65 Ah | 29 min | 42 min | 1 hr 10 min | 2 hr 55 min |
| 100 Ah | 51 min | 1 hr 15 min | 2 hr 5 min | 4 hr 50 min |
| 150 Ah | 1 hr 25 min | 2 hr 5 min | 3 hr 30 min | 7 hr 45 min |
| 200 Ah | 2 hr 5 min | 3 h | 4 hr 50 min | 10 hr 40 min |
384V (32 cord) version times are longer because less current is drawn from each battery. For example, with 26 Ah batteries, you get about 16 minutes at full load, with 65 Ah batteries, about 54 minutes, with 100 Ah batteries, about 1 hour and 35 minutes.

Example calculation: 9000 W load in the laboratory
In a laboratory, the devices, server and network equipment draw a total of 9000 W. The UPS is 240 V, there are 20 65 Ah batteries in the battery cabinet.
- Battery energy: 20 × 12 V × 65 Ah = 15600 Wh.
- Current: 9000 ÷ (0.9 × 20 × 11.5 V) = approximately 43.5 A.
- C-rate: 43.5 ÷ 65 = approximately 0.67.
- Available rate: Since the C-ratio is between 0.5-1, it is 0.50 (for the ratio table 1 kVA inscription see).
- Duration: 15600 × 0.50 ÷ 9000 = 0.87 hours, so about 52 min.
If the goal is 30 minutes, also look with 40 Ah batteries: Wh = 9600, C-ratio approx. 1.1, ratio 0.40. Duration = 9600 × 0.40 ÷ 9000 = approx 26 min. In other words, 40 Ah remains at the limit, 65 Ah passes easily.

What is the maximum amount of battery connected to a 15 kVA UPS?
The number of batteries is fixed
20 (240 V) or 32 (384 V) 12 V batteries are connected in series. You cannot change this number. To extend the time, switch to batteries with larger Ah or add the same string in parallel. The number of parallel strings is usually limited to 2-4. Refer to the manufacturer's data sheet. See What is a Battery String?.
Charging current is the most important limit
At this power, the charging current in standard models is usually a few amperes. In long-run models, it can be 10-20 A or above. The exact value is in the data sheet.
Rule: Ah = charging current × 10 (comfortable) to 20 × (limit).
| UPS charging current | Recommended maximum battery (Ah) | Full charge time (roughly) |
|---|---|---|
| 4 A | 40-80 Ah | 12-24 hours |
| 8 A | 80-160 Ah | 12-24 hours |
| 12 A | 120-240 Ah | 12-24 hours |
| 20 A | 200-400 Ah | 12-24 hours |
Coarse charging time: Ah × 1.2 ÷ charging current (hours). For 65 Ah in the laboratory example above, a charging current of 4-6 A is sufficient.
DC current, cable and protection
At full load, the DC current is approximately 65 A in the 240 V model and approximately 41 A in the 384 V model. At this level, the cable cross-section, the choice of DC fuse and switch must be taken into account. Insufficient cross-section leads to heating and loss of time.
Weight and area
20 x 12 V 65 Ah batteries hold approx. 380-420 kg. Check the floor load and cabinet placement before installation. For battery room and ventilation, see Lithium Battery Cabinet Installation: Layout, Ventilation, and Safety Distances (written for lithium, the principles of settlement are similar).
Highest Ah battery
The practical upper limit for single-block 12 V batteries is around 200 Ah. For larger capacities, 2 V cells (OPzV/OPzS) are preferred. See What is OPzS and OPzV Battery?.
Security: 240-384 V DC is life-threatening. Battery addition, cabin connection and insurance works are the work of authorized personnel.
15 kVA is usually three-phase
15 kVA UPSs are mostly 3 phase input, 1 phase output (3/1) or 3 phase input, 3 phase output (3/3). It is selected according to the network of the building and the structure of the load. See Differences Between Three-Phase and Single-Phase UPS and Differences Between Transformered and Transformerless UPS.
Summary for all kVA classes on one page: How Long Does a UPS Work? kVA Guide
Frequently Asked Questions
01Does a 15 kVA UPS run for 1 hour?
02Should I choose a modular UPS over a 15 kVA UPS?
03Efficiency of the 15 kVA UPS and ECO mode
04How do I verify duration?
Let's Choose the Right UPS Together
Tell us your load and the time you want, and we will determine the UPS power, battery cabinet and capacity together. Our three-phase online UPS models or You can contact us.