How Long Does a 100 kVA UPS Work? Duration Table and Calculation
100 kVA UPS; It is used in the main electrical infrastructure of data centers, hospitals, large factories, telecom facilities and commercial buildings. At this power, DC current exceeds 200 amps at full load. The battery pack is mostly installed with 12 V blocks arranged in parallel; 2 V cells are also used in long-term projects. In this article, we explained the duration table, calculation method and the maximum amount of battery that can be connected to the UPS.
Short answer
The DC voltage of a 100 kVA UPS is usually 480 V (40 x 12 V blocks or 240 x 2 V cells). Some models use different voltages, such as 360 V, ±240 V or 576 V. Refer to the label and data sheet for the number of batteries. Approximate times with a 480 V group:
- At full load (approx. 90000 W) with 200 Ah (12 V block): 25 minutes
- At full load with 500 Ah (2 V cell): approx. 1 hour 25 minutes
- At half load with 500 Ah (approx. 45000 W): approx. 3 hours 30 minutes
- At full load with 1000 Ah: approx. 3 hours 30 minutes
For most projects, the target time is 10-30 minutes. This time acts as a bridge until the generator kicks in.
How many watts does a 100 kVA UPS carry?
- 100 kVA in a UPS with a power factor of 0.9 is approximately 90000 W does.
- In the new generation model with a power factor of 1,0 100000 W does.
- In the old model with a power factor of 0.8 80000 W does.
The power factor is written in the data sheet. See What is Power Factor?.

Time table for 100 kVA UPS (480 V DC)
Durations for new VRLA/AGM battery, 25 °C and 0.9 power factor and 90% UPS efficiency They are rough calculations. The actual time may deviate by 20-30% ± depending on the model. The 200 Ah line is for 40 pcs of 12 V blocks, the others are for 240 pcs of 2 V cells.
| Ah value of the battery pack | Full load (90000 W) | 75% load (67500 W) | Half load (45000 W) | 25% load (22500 W) |
|---|---|---|---|---|
| 200 Ah (12 V block) | 26 min | 38 min | 1 hr 5 min | 2 hr 40 min |
| 300 Ah (2 V cell) | 44 min | 1 hr 5 min | 1 hr 50 min | 4 hr 20 min |
| 500 Ah (2 V cell) | 1 hr 27 min | 2 hr 5 min | 3 hr 30 min | 7 hr 45 min |
| 800 Ah (2 V cell) | 2 hr 40 min | 3 hr 45 min | 6 h | Over 12 h |
| 1000 Ah (2 V cell) | 3 hr 30 min | 4 hr 50 min | 7 hr 45 min | Over 12 h |
The calculation loses its reliability for periods above 12 hours. A generator solution is used for such a long time at this power.

Example calculation: 60000 W load in data center
In a data center, servers, storage, network devices and cooling control equipment draw a total of 60000 W. UPS 480 V DC input, battery pack 300 Ah (240 x 2 V cells).
- Battery energy: 480 V × 300 Ah = 144000 Wh (240 cells × 2 V × 300 Ah).
- Current: 60000 ÷ (0.9 × 40 × 11.5 V) = approximately 145 A.
- C-rate: 145 ÷ 300 = approximately 0.48.
- Available rate: Since the C-ratio is between 0.2-0.5, 0.60 (for the ratio table 1 kVA inscription see).
- Duration: 144000 × 0.60 ÷ 60000 = 1.44 hours, so about 86 minutes.
If the goal is 2 hours, repeat with the group of 500 Ah: Wh = 240000, C-ratio approx. 0.29, proportion 0.60. Duration = 240000 × 0.60 ÷ 60000 = approx 144 minutes.
For load analysis, see. UPS and Battery Capacity Project Design.

What is the maximum amount of battery connected to a 100 kVA UPS?
The number of batteries is fixed
On the 480 V model, 40 12 V blocks or 240 2 V cells are connected in series. You cannot change this number. To extend the time, cells with larger Ah are switched or parallel is added from the same array. The number of parallel arrays is usually limited to 2-4. Refer to the manufacturer's data sheet. See What is a Battery String?.
Charging current is the most important limit
At this power, the charging current can be 20-60 A or above depending on the model. The exact value is in the datasheet.
Rule: Ah = charging current × 10 (comfortable) to 20 × (limit).
| UPS charging current | Recommended maximum battery (Ah) | Full charge time (roughly) |
|---|---|---|
| 20 A | 200-400 Ah | 12-24 hours |
| 40 A | 400-800 Ah | 12-24 hours |
| 60 A | 600-1200 Ah | 12-24 hours |
| 100 A | 1000-2000 Ah | 12-24 hours |
Rough charging time: Ah × 1.2 ÷ charging current (hours). In the example above, 15-30 A is sufficient for 300 Ah, and 25-50 A for 500 Ah.
DC current, cable and protection
At full load, DC current is approximately 217 A. At this level, the selection of copper bus or large cross-section cable, DC fuse and switch must be made with calculation. Positioning the battery pack as close as possible with the UPS reduces both loss and heating.
Weight, space and ventilation
40 12 V 200 Ah blocks hold approximately 2300-2500 kg. 240 units of 2 V 300 Ah cells hold approximately 4500-5000 kg, 500 Ah cells approximately 7000-8000 kg, 1000 Ah cells approximately 14500-16000 kg. For these weights, the floor load and rack carrying capacity must be verified by static calculation before installation. Ventilation, temperature and fire safety in the battery room are planned separately. See Factors Affecting Battery Life.
Highest Ah battery
The practical upper limit of 12 V blocks is around 200 Ah. For 300 Ah and above, 2 V cells (OPzV/OPzS) are used at this power. See What is OPzS and OPzV Battery?. If space and weight are a problem, a lithium battery is also an option. See Lithium-Ion UPS Batteries and What is Thermal Runaway? How to Prevent It in Batteries?.
Security: 480 V DC is life-threatening. Battery addition, connection and insurance are the work of authorized personnel.
Single UPS, modular or parallel at 100 kVA?
There are three approaches to this power: a single large UPS, a parallel UPS, or a modular UPS. For critical loads, N+1 or 2N redundancy is preferred. If one fails or is serviced, the other carries the load. See What is a Modular UPS?, What is Redundancy in UPS?, Parallel UPS Installation and Load Sharing and UPS Architecture in Data Centers.
Summary for all kVA classes on one page: How Long Does a UPS Work? kVA Guide
Frequently Asked Questions
01Does a 100 kVA UPS work for 1 hour?
02Is a battery room required for a 100 kVA UPS?
03Do I need a generator?
04How do I verify duration?
Let's Choose the Right UPS Together
Tell us your load and the desired time, and we'll determine the UPS power, battery bank, and battery room requirements together. Our three-phase online UPS models or You can contact us.