250 kVA UPS; It is used for large data centers, hospital campuses, refineries and organized industrial facilities. At this power, DC current exceeds 500 amps at full load. The battery system is not a single cabinet, but a battery room consisting of parallel arrays. In this article, we explained the duration table, calculation method and the maximum amount of batteries that can be connected to the system.
Short answer
The battery pack of a 250 kVA UPS system is usually 480 V DC (40 12 V blocks or 240 2 V cells). Some manufacturers use different voltages, such as 576 V. A single battery string is not enough at this power. More than one string is connected in parallel and the time is total Ah value determined accordingly. In this article, all times are given over the total Ah. Approximate times:
- At full load (approx. 225000 W) with a total of 800 Ah: approx. 48 minutes
- At full load with a total of 1000 Ah: approx. 1 hour 5 minutes
- At half load (approx. 112500 W) with a total of 1000 Ah: approx. 2 hours and 40 minutes
- At full load with a total of 2000 Ah: approx. 2 hours 40 minutes
The calculations were made with 90% efficiency and 0.9 power factor. Since the efficiency of the new generation large UPSs is higher, the actual times may be a little longer. In most projects, the target time is 10-30 minutes. This time acts as a bridge until the generator is activated.
How many watts does a 250 kVA UPS carry?
- In the system with a power factor of 0.9, 250 kVA is approximately 225000 W does.
- In the new generation model with a power factor of 1,0 250000 W does.
- In the old model with a power factor of 0.8 200000 W does.
The power factor is written in the data sheet. See What is Power Factor?.

Time table for 250 kVA UPS (480 V DC, total Ah)
Durations for new VRLA/AGM battery (2 V cell), 25 °C and 0.9 power factor and 90% UPS efficiency They are rough calculations. The actual time may deviate by 20-30% ± depending on the model. "Total Ah" is the sum of the Ah values of all 480 V arrays connected in parallel.
| Total battery capacity | Full load (225000 W) | 75% load (168750 W) | Half load (112500 W) | 25% load (56250 W) |
|---|---|---|---|---|
| 500 Ah | 26 min | 38 min | 1 hr 5 min | 2 hr 40 min |
| 800 Ah | 48 min | 1 hr 10 min | 1 hr 59 min | 4 hr 40 min |
| 1000 Ah | 1 hr 5 min | 1 hr 34 min | 2 hr 40 min | 6 h |
| 1500 Ah | 1 hr 50 min | 2 hr 40 min | 4 hr 20 min | 9 hr 30 min |
| 2000 Ah | 2 hr 40 min | 3 hr 45 min | 6 h | Over 12 h |
The calculation loses its reliability for periods above 12 hours. A generator solution is used for such a long time at this power.

Example calculation: 160000 W load in refinery control building
In a refinery control building, DCS systems, security systems, server room and emergency lighting draw a total of 160000 W. The UPS system has a 480 V DC input, the total battery capacity is 1000 Ah.
- Battery energy: 480 V × 1000 Ah = 480000 Wh.
- Current: 160000 ÷ (0.9 × 40 × 11.5 V) = approximately 386 A (sum of all sequences).
- C-rate: 386 ÷ 1000 = approximately 0.39.
- Available rate: Since the C-ratio is between 0.2-0.5, 0.60 (for the ratio table 1 kVA inscription see).
- Duration: 480000 × 0.60 ÷ 160000 = 1.8 hours, so about 108 minutes.
If the target is 2 hours and 30 minutes, repeat with the group of a total of 1500 Ah: Wh = 720000, C-ratio approx. 0.26, ratio 0.60. Duration = 720000 × 0.60 ÷ 160000 = approx 162 minutes.
For load analysis, see. UPS and Battery Capacity Project Design.

What is the maximum amount of battery connected to a 250 kVA UPS?
The number of batteries is fixed, the number of parallel strings is limited
Each string connects 240 2 V cells (480 V) in series. You cannot change this number. To extend the time, the cell Ah value is increased or a parallel array is added. Since the DC current at this power exceeds 500 amps, two or more parallel battery strings are installed in almost every project. The highest number of parallel strings in the manufacturer's data sheet and the total Ah limit must be observed. See What is a Battery String?.
Charging current is the most important limit
At this power, the charging current is not provided by a single circuit. The charging circuit of each UPS unit is collected or a separate charging rectifier is added. The exact value is in the data sheet.
Rule: Ah = charging current × 10 (comfortable) to 20 × (limit).
| Total charging current | Recommended maximum total battery (Ah) | Full charge time (roughly) |
|---|---|---|
| 100 A | 1000-2000 Ah | 12-24 hours |
| 200 A | 2000-4000 Ah | 12-24 hours |
| 400 A | 4000-8000 Ah | 12-24 hours |
| 800 A | 8000-16000 Ah | 12-24 hours |
Rough charging time: Ah × 1.2 ÷ charging current (hours). In the example above, a total charging current of 50-100 A is required for 1000 Ah, and 75-150 A for 1500 Ah.
DC current, busbar and protection
At full load, the total DC current is about 543 A. This current does not flow through a single string. Each string must have its own DC fuse and switch. Copper bus sections, short circuit strength, and bus distances require project engineering.
Weight, space and ventilation
A group of 2 V cells of 480 V weighs roughly 15 kg × AAh. For example, 1000 Ah costs about 15 tons, 2000 Ah about 30 tons. For these weights, the floor load and rack-bearing capacity must be verified by static calculation before installation. Ventilation, temperature and fire safety are planned separately in the battery room. See Factors Affecting Battery Life.
Lithium option
If space and weight are a problem, a lithium battery is also an option. See Lithium-Ion UPS Batteries and What is Thermal Runaway? How to Prevent It in Batteries?. For 2 V cells, see V. What is OPzS and OPzV Battery?.
Security: 480 V DC is life-threatening. Battery addition, connection and insurance are the work of authorized personnel.
Is 250 kVA a single UPS or a system?
250 kVA is available as a single unit in some manufacturers. However, in most critical facilities, a parallel system such as two 125 kVA or three 100 kVA is preferred. This means that even if one unit fails or is serviced, the load is not interrupted. The manufacturer and model set the limits in this regard. See What is a Modular UPS?, What is Redundancy in UPS?, Parallel UPS Installation and Load Sharing and UPS Architecture in Data Centers.
Summary for all kVA classes on one page: How Long Does a UPS Work? kVA Guide
Frequently Asked Questions
01Does a 250 kVA UPS run for 1 hour?
02Is a battery room required for a 250 kVA UPS?
03Do I need a generator?
04How do I verify duration?
Let's Choose the Right UPS Together
Tell us your load and the desired time, and we will determine the UPS system, battery pack and battery room requirements together. Our three-phase online UPS models or You can contact us.