How Long Does a 160 kVA UPS Work? Duration Table and Calculation

How Long Does a 160 kVA UPS Work? Duration Table and Calculation

160 kVA UPS; It is used for large data centers, organized industrial facilities, hospital campuses and telecom centers. At this power, DC current reaches 350 amps at full load and parallel arrays are mostly installed instead of a single battery array. In this article, we explained the time table, calculation method and how many batteries can be connected to the UPS.

Short answer

The DC voltage of a 160 kVA UPS is usually 480 V (40 x 12 V blocks or 240 x 2 V cells). Some models use different voltages, such as 360 V, ±240 V or 576 V. Refer to the label and data sheet for the number of batteries. Approximate times with a 480 V group:

  • At full load (approx. 144000 W) with 300 Ah (2 V cell): approx. 25 minutes
  • At full load with 500 Ah: approx. 47 minutes
  • At half load with 500 Ah (approx. 72000 W): approx. 1 hour and 55 minutes
  • At full load with 1000 Ah: approx. 1 hour 55 minutes

For most projects, the target time is 10-30 minutes. This time acts as a bridge until the generator kicks in.

How many watts does a 160 kVA UPS carry?

  • In a UPS with a power factor of 0.9, 160 kVA is approximately 144000 W does.
  • In the new generation model with a power factor of 1,0 160000 W does.
  • In the old model with a power factor of 0.8 128000 W does.

The power factor is written in the data sheet. See What is Power Factor?.

Two battery strings connected in parallel and DC switch cabinet

Time table for 160 kVA UPS (480 V DC)

Durations for new VRLA/AGM battery, 25 °C and 0.9 power factor and 90% UPS efficiency They are rough calculations. The actual time may deviate by 20-30% ± depending on the model. If there is a 200 Ah line, 40 pcs are for 12 V blocks, the others are for 240 pcs 2 V cells.

Ah value of the battery packFull load (144000 W)75% load (108000 W)Half load (72000 W)25% load (36000 W)
200 Ah (12 V block)14 min21 min35 min1 hr 27 min
300 Ah (2 V cell)24 min35 min59 min2 hr 25 min
500 Ah (2 V cell)47 min1 hr 8 min1 hr 56 min4 hr 30 min
800 Ah (2 V cell)1 hr 27 min2 hr 5 min3 hr 30 min7 hr 45 min
1000 Ah (2 V cell)1 hr 56 min2 hr 45 min4 hr 30 min9 hr 55 min

The calculation loses its reliability for periods above 12 hours. A generator solution is used for such a long time at this power.

Server rack rows in data center protected by UPS

Example calculation: 100000 W load in data center

In a data center, the server hall, storage systems, network core and precise cooling control draw a total of 100000 W. UPS 480 V DC input, battery pack 500 Ah (240 x 2 V cells).

  1. Battery energy: 480 V × 500 Ah = 240000 Wh (240 cells × 2 V × 500 Ah).
  2. Current: 100000 ÷ (0.9 × 40 × 11.5 V) = approximately 242 A.
  3. C-rate: 242 ÷ 500 = approximately 0.48.
  4. Available rate: Since the C-ratio is between 0.2-0.5, 0.60 (for the ratio table 1 kVA inscription see).
  5. Duration: 240000 × 0.60 ÷ 100000 = 1.44 hours, so about 86 minutes.

If the target is 2 hours, repeat with the 800 Ah group: Wh = 384000, C-ratio approx. 0.30, ratio 0.60. Duration = 384000 × 0.60 ÷ 100000 = approx 138 minutes.

For load analysis, see. UPS and Battery Capacity Project Design.

Engineer checking DC switch board in battery room

What is the maximum amount of battery connected to a 160 kVA UPS?

The number of batteries is fixed

On the 480 V model, 40 12 V blocks or 240 2 V cells are connected in series. You cannot change this number. To extend the time, switch to cells with larger Ah or add parallel from the same array. The number of parallel strings is usually limited to 2-4. Refer to the manufacturer's data sheet. Since DC current at this power reaches 350 amps, installing two parallel strings instead of a single string both divides the current and provides redundancy when one string fails. See What is a Battery String?.

Charging current is the most important limit

At this power, the charging current can be 20-60 A or above depending on the model. The exact value is in the datasheet.

Rule: Ah = charging current × 10 (comfortable) to 20 × (limit).

UPS charging currentRecommended maximum battery (Ah)Full charge time (roughly)
20 A200-400 Ah12-24 hours
40 A400-800 Ah12-24 hours
60 A600-1200 Ah12-24 hours
100 A1000-2000 Ah12-24 hours

Rough charging time: Ah × 1.2 ÷ charging current (hours). In the data center example above, a charging current of 25-50 A is required for 500 Ah, and 40-80 A for 800 Ah.

DC current, cable and protection

At full load, DC current is approximately 348 A. At this level, the selection of copper bus or large cross-section cable, DC fuse and switch must be made with calculation. Positioning the battery pack as close as possible with the UPS reduces both loss and heating.

Weight, space and ventilation

40 12 V 200 Ah blocks hold approximately 2300-2500 kg. 240 units of 2 V 500 Ah cells hold approximately 7000-8000 kg, 800 Ah cells approximately 11500-12500 kg, 1000 Ah cells approximately 14500-16000 kg. For these weights, the floor load and rack carrying capacity must be verified by static calculation before installation. Ventilation, temperature and fire safety in the battery room are planned separately. See Factors Affecting Battery Life.

Highest Ah battery

The practical upper limit of 12 V blocks is around 200 Ah. For 300 Ah and above, 2 V cells (OPzV/OPzS) are used at this power. See What is OPzS and OPzV Battery?. If space and weight are a problem, a lithium battery is also an option. See Lithium-Ion UPS Batteries and What is Thermal Runaway? How to Prevent It in Batteries?.

Security: 480 V DC is life-threatening. Battery addition, connection and insurance are the work of authorized personnel.

Single UPS at 160 kVA, modular or parallel?

Two methods stand out in this power: running two 80 kVA UPSs in parallel or installing a modular UPS. In the modular structure, the faulty module can be replaced live and the module can be added as the load grows. In facilities that cannot tolerate interruptions, N+1 or 2N redundancy is preferred. See What is a Modular UPS?, What is Redundancy in UPS?, Parallel UPS Installation and Load Sharing and UPS Architecture in Data Centers.

Frequently Asked Questions

01Will a 160 kVA UPS run for 1 hour?
At a load of up to 72000 W, you get about 1 hour and 55 minutes with a group of 2 V cells of 500 Ah, and about 1 hour with a group of 300 Ah. For 1 hour at full load, a group of about 600 Ah is required.
02Is a battery room required for a 160 kVA UPS?
Yes, it is essential in practice. Racking requires ventilation, temperature control, and fire safety.
03Do I need a generator?
If the goal is to run longer than 30 minutes at full load, the generator is almost always more economical. See Differences Between UPS and Generator.
04How do I verify duration?
The most reliable method is the discharge test. See Discharge and Load Tests.