UPS for Banks and Financial Institutions: Branch, ATM, Cash Register and Redundancy

UPS for Banks and Financial Institutions: Branch, ATM, Cash Register and Redundancy

In banking, a power outage is not just a service outage; an unfinished withdrawal, a security camera that is deregistered, or a computer that goes off at the counter becomes an event that needs to be disclosed later. That's why banks and financial institutions look at UPS as a matter of business continuity and audit, unlike any other industry. This article looks at three levels: branch, ATM and head office. The head office and data center are separate engineering topics; we're just pointing you in the direction here.

Interruption in the Branch

SystemTypical powerNote
Box office computer + display + printer100–250 WOpen transaction should not be left unfinished
Money counting and counterfeiting machine50–150 W, peak operating currentMotorized; taken into account in length
Retail banking desks100–150 WDesktop or thin client
Network, firewall, encryption devices50–200 WConnection to the center
Camera recording and monitoring100–300 WRecord continuity is important
Switchboard, queue matic30–100 W
Safe room time lock and alarmOwn batteryWith its own certified feed

A medium-sized branch holds these loads at 3–6 kW; 5–10 kVA online UPS and labeled UPS sockets separate from the toll/desk line are the standard layout. Since money counting machines are motorized, they draw a short peak current at the time of operation; when several machines work at the same time, small UPSs do not carry it, leaving a share in the length. The time lock and alarm system of the safe room come with its own certified battery supply; moving it to the UPS is both unnecessary and may disrupt the certification requirements of the alarm system. Only the authorized security company intervenes in the supply of the alarm system.

ATM: Small but Critical in the Outdoor Environment

The ATM itself draws between 300 and 1500 W; this wide range is often due to the heater or air conditioning module inside the device. The heater and air conditioner are not connected to the UPS or are supplied from a separate line; The UPS is made up of computers, money modules, card readers, displays and connection devices. For these, 1–3 kVA online UPS is sufficient. The main risk of an ATM outage is that the customer's transaction is interrupted: a customer whose card is left inside, whose money has been counted but not given, or who has been deducted from his account but not received it. The UPS provides the time to complete the transaction; the ATM software also stops receiving new transactions when an outage is detected. The temperature in the ATM cabinet on the outer wall can rise to 50 °C in summer; the battery in this environment can hardly last two years. If possible, the UPS is placed inside the building, separate from the cabinet.

Duration Target

A significant number of branches do not have generators; The UPS cannot bear the entire outage, but it gives time for open transactions to be closed and systems to shut down properly. Common targets are 15–30 minutes for a branch and 30–60 minutes for an ATM; The ATM time is kept long because the load is small and the ATM is available after the branch closes. If longer time is required for camera recording, the recorder and cameras are supplied with a separate, small UPS or external battery cabinet. Time calculation How to calculate battery time We explained it in the article.

Head Office and Data Center

The bank's core systems, unlike branch offices, are protected by a redundant UPS architecture: two independent UPS lines (2N), supplying each server from two power sources, generator, fuel, and regular commissioning trials. This design is a separate issue; it includes the options of redundancy. UPS redundancy: N+1, 2N, parallel In his article, he emphasized data center design UPS design for data center We explained it in the article.

Business Continuity and Audit: Registration is Key

In financial institutions' business continuity and information systems audits, the management of the UPS is as much a question as its existence. The documents that the auditor will see are usually the following: inventory and battery ages of the UPSs at each location, annual maintenance reports, battery operation and load test records, battery replacement plan, maintenance contract, fault and outage records. Even if the UPS itself is intact, if these documents are not present, the audit will find it incomplete. What the maintenance contract should cover What is a maintenance contract How to embed UPS in the business continuity plan UPS in business continuity planning We explained it in the article. In banks with hundreds of branches, it is essential to monitor all UPSs in a single plan and remotely; this UPS maintenance management in multi-location businesses We discussed it in the article.

Branch Moving and Renewal

It is a common mistake to take the UPS to the new location with its old batteries when moving the branch; old batteries that are shaken during transportation and remain uncharged for a while do not work at the first outage of the new branch. The battery age of the UPS is checked during the move; if it has exceeded three years, the batteries are replaced at the new location and an interruption attempt is made during commissioning. The increasing number of desks and toll booths in branch renewal may limit the capacity of the UPS; the growth margin must be recalculated.

Remote Branches and Maintenance

Maintenance of UPSs in banks with common branches is a logistical task: each branch is visited at least once a year, the internal resistance of the battery is measured, a working test is made on the battery, and the report is sent to the bank's headquarters. In order for these visits to be made while the branch is open, without interrupting the counter, the UPS must have a maintenance bypass; otherwise, maintenance will be out of hours and the cost will increase. Thanks to UPSs with network cards, battery failure is seen at the center without going to the branch and the visit plan can be brought forward according to the failure. When battery replacements are planned collectively per region, not per branch, both the cost decreases and the battery age of all branches comes to the same line. Steps of battery replacement How to replace a UPS battery We explained it in the article.

Common Mistakes

  • Failing to account for the peak current of money counting machines; during peak hour, the UPS gives a warning.
  • Feeding the ATM's heater or air conditioning module from the UPS; the time is reduced to a few minutes.
  • Putting the ATM UPS in the outdoor cabinet, in the sun; the battery will run out in two years.
  • Moving the safe room and alarm system to UPS and breaking the certification conditions.
  • Not keeping maintenance and test records; it appears that the UPS is present in the audit but no management.
  • Not replacing old batteries when moving branches.

For a single maintenance plan, audit-ready reports and battery change schedule for your branch and ATM UPSs to our maintenance plans or You can contact us.

A record is also kept with the UPS

5–10 kVA online UPS for toll booth, counting machine, network and camera at the branch; 1–3 kVA online UPS for computer, cash module and connection at ATM are standard. The time lock and alarm of the safe room remain with its own certified supply. In the business continuity audit, UPS inventory, maintenance and test records and battery replacement plan are requested.
Branch, ATM and head office levels in the bank

Frequently Asked Questions

01How many kVA UPS is required for a bank branch?
The toll booth, table, counting machine, network and camera loads of a medium-sized branch hold 3–6 kW; 5–10 kVA online UPS and separate UPS sockets to the toll booth line are the standard layout. The exact length is determined by measuring the load in the discovery.
02Do ATMs need UPS?
required; so that the customer's transaction is not interrupted in case of interruption. 1–3 kVA online UPS is sufficient for computer, money module, card reader and connection; heater and air conditioning module are not connected to UPS.
03What is required for UPS in the audit?
Usually UPS inventory and battery ages, annual maintenance reports, battery operation and load test records, battery replacement plan, maintenance contract and outage records. The detail varies according to the organization's internal policy and the scope of the audit.
04Should the safe room and alarm system be connected to the UPS?
No; these systems come with their own certified battery power. Only the authorized security company intervenes in their supply; moving it to the UPS may violate the certification requirements.
05What is 2N redundancy?
Each load is fed from two independent UPS lines; even if one fails or is taken into maintenance, the other carries the entire load. It is used in headquarters and data centers; details are in our redundancy article.

For Your Branch and ATM UPSs

Let's gather your branch and ATM UPSs in a single plan and monitor them with maintenance and test reports ready for inspection; For on-site projects in Istanbul and surrounding provinces, and for industrial-scale projects in distant cities Contact Us.