TCMB foreign exchange selling rate · 25.11.2026: USD 50,64 ₺ EUR 55,40 ₺

Frequency and Synchronization Issues in Generator-Fed UPS

Frequency and Synchronization Issues in Generator-Fed UPS

When the power goes out, the generator is activated, and the UPS waits for it. This chain, which seems simple on paper, often fails in the field: The generator starts to work, but the UPS does not return to the mains side, it goes into battery mode, a warning such as "cannot synchronize to bypass" appears on the screen, and the load shuts off when the battery runs out. Moreover, the generator is working very well at that time.

The main reason for this is that the generator is not an "infinite power" source like the mains. When the load enters, the speed and frequency fluctuate, the voltage fluctuates; the rectifier and bypass line of the UPS react to this change much more sensitively than the network. In this article, we explain in plain language why frequency is important, what synchronization means, the most common symptoms, the adjustments to be made on the UPS and generator side, and generator sizing.

Article; It has been prepared for facility and technical affairs managers, purchasing units, business owners carrying out generator and UPS projects, and anyone planning a new installation. Adjustment and connection operations are done in high-energy systems; therefore, what is described here is information that will help you make a decision together with authorized personnel, it is not a do-it-yourself instruction.

Why is frequency important when generator and UPS work together?

In Turkey, the network frequency is 50 Hz and the network keeps this value in a very narrow band thanks to the inertia of a very large system. In the generator, the frequency is directly dependent on the engine speed. The governor adjusts the speed of the motor; if the load increases suddenly, the speed drops for a moment, and the frequency also decreases. The frequency and voltage oscillate for a while until the governor and the voltage regulator (AVR) recover it.

On the UPS side, there are three parts that are sensitive to this oscillation:

  • Rectifier / charging unit: Monitors the voltage and frequency of the input; if it goes out of tolerance, it rejects the input and the UPS returns from the battery to the supply.
  • Bypass Line: The frequency and phase stability of the bypass source is a prerequisite for the load to pass to bypass without interruption.
  • Inverter synchronization circuit: It attempts to lock the outlet to the bypass source; if the source is slipping too fast, it releases the lock.

This structure is correct for the UPS's mission: not to connect the load to a broken source. The problem arises when the generator is not "broken" but goes out of bounds for a short time during load input. In field publications, this situation is referred to in particular as the step loading effect: When the switch connected to the generator is turned off, the sudden application of the load can lead to sudden oscillations in frequency and voltage.

Electrical panel with measuring device showing UPS input frequency and voltage

What Is Synchronization and Why Does UPS Sync to Bypass?

Synchronization is when the frequency, phase angle and voltage of the two AC sources are close enough to each other. In a double-conversion UPS, the inverter aligns its output with respect to the bypass source in this way. Thus, in the event of an overload or UPS failure, the static switch can transfer the load to the bypass line without interruption. For details of the bypass concept In the article where we explain the differences between static bypass and maintenance bypass, You can look at it.

Sources summarize what a seamless transition requires as follows: Frequency, voltage and phase matching. Otherwise, circulating currents and sudden voltage jumps occur at the time of switching. According to a field description, in modern static UPS systems, switching is completed within milliseconds after the inverter is locked to the bypass within a phase difference of a few degrees. Therefore, if the bypass source is too volatile, the UPS decides "not suitable for switching" and most manufacturers disable the bypass in this case.

There is another important detail: The inverter only follows the bypass up to a certain band when it is locked monitoring. When the tracking limit is exceeded, the inverter switches to its internal clock (free-running) and the bypass becomes unusable. This behavior is also defined in the industrial UPS specifications: If the input frequency exceeds the specified synchronization limits, the inverter returns to free-running. This means that the continuous monitoring and locking cycle means that the bypass backup of the system is effectively disabled.

Common Symptoms of a Generator-Powered UPS

The table below shows the most common conditions in the field and their possible root causes. The table is a diagnostic guide; recording and measurement are required for a definitive diagnosis.

SymptomPossible causeFirst check
UPS switches to battery mode on the generatorFrequency or voltage goes out of the UPS input window during load inputUPS event recording; frequency and voltage recording at the time of generator commissioning
"Unable to sync to bypass" alarmFrequency change rate (slew rate) or bypass frequency window too narrowUPS bypass frequency and tilt settings; governor response
UPS waits a long time before accepting entryUPS uses a validation period that waits for the source to be stable for a certain period of timeInput acceptance delay; generator warm-up and stability time
Large drop in frequency when the generator enters the loadThe rectifier and charging unit suddenly draw full power or the generator is smallRectifier soft start time; generator kVA/kW share
Tensions fluctuate, generator "hunting"AVR and governor response are incompatible; revs and voltage trigger each otherGovernor/AVR adjustment with generator service
Voltage waveform is distorted, THD is highUnfiltered rectifier harmonics; high generator reactanceTHD measurement; UPS input filter or active rectifier

Many of these symptoms will have a visible alarm on the UPS display. For general reading of alarms Check out our guide to evaluating UPS alarm and error codes You can use it.

Frequency Tolerance of UPS and IEC 62040-3 Classification

The input behavior of UPSs is described in the classes defined in the IEC 62040-3 standard. In the VFI (voltage and frequency independent) class, the output is independent of the input voltage and frequency; online UPSs are in this class. In class VI, the output voltage is independent of the input, but the frequency depends on the input; in the VFD class, the output follows the input in both voltage and frequency. To compare the types online, line-interactive and offline UPS can be looked at.

A frequency-related test is also included in the standard: The steady-state input voltage tolerance test is repeated at the frequency limits specified by the manufacturer. The US Department of Energy's UPS test procedure also includes tolerance notes for input voltage and frequency, such as 10±% and ±2%, in accordance with IEC specifications. These are values given in the context of the test procedure; the frequency window of a real product is written in the manufacturer's data sheet and varies depending on the model. For this reason, when selecting a generator, the "input frequency range" and "bypass frequency range" in the UPS data sheet should be read separately. For the general framework of standards and documents UPS standards and certifications You can review our article.

A login window is not the same as a bypass window

The rectifier input of a UPS can accept a relatively wide frequency band; because the output of the rectifier is DC and the frequency has no precise importance. The bypass window is narrower; because the load will be connected directly to this source. This difference is seen in the field as "The UPS accepts the generator, but the bypass is not ready". While the rectifier is working in the generator, the battery is charged, the load is maintained; however, the bypass backup is disabled.

Numeric example: percent and Hz

Assumption: Suppose the nominal frequency is set to 50 Hz and the UPS bypass window is set to ±2%.

  1. ±2% window = 50 × 0.02 = ±1 Hz; that is, 49-51 Hz is considered.
  2. If the frequency drops to 48.5 Hz for a short time during the load step in the generator, the deviation is 3%.
  3. This deviation is outside the window; UPS does not consider the bypass safe and stops syncing.
  4. The window can be opened to ±4% (±2 Hz), and if the load is based on this deviation, the same event remains within the accepted range.

The values are only intended to show ratios. The frequency deviation tolerance of a load depends on the power supply structure; it is not correct to extend the setting window without consulting the manufacturer of the load. Modern switching power supplies are often frequency insensitive; however, devices with synchronous motors or frequency-dependent timers may behave differently.

Control panel and speed regulator section of diesel generator

Generator Side: Governor, AVR, and Frequency Stability

Frequency stability is mostly achieved on the generator side. Common recommendations in publications are: The generator's governor should be fast-responsive, sized and tuned correctly for the system. The generator's voltage regulator (AVR) should not respond faster than the governor; otherwise, an unstable loop may occur with the UPS charging circuit. The balance of these two settings is the job of field service.

SubjectWhat does this mean?Note for the UPS app
Electronic governorElectronically and quickly adjusts engine speedLess frequency deviation is expected in the load step compared to the mechanical governor
Isocrone modeIt tries to keep the frequency constant regardless of the loadIt is mostly preferred for single generator and UPS supply
Droop modeAs the load increases, it lowers the frequency by a certain percentageUsed for load sharing in parallel generators; forces the UPS window if the slope is large
AVRKeeps voltage constant by adjusting alternator excitationIt should not be faster than the Governor; otherwise, vibration may occur with the charging circuit
Warm-up and stability timeTime taken for the frequency to settle after the generator is commissionedUPS entry acceptance delay must be above this time

For example, if a generator with a droop setting of 4% is designed to have a no-load frequency of 52 Hz and 50 Hz at full load, approximately 51 Hz is seen when the load is at 50%; this value means that ±2% is at the edge of the window. This example shows how the droop can eat the UPS window. Actual settings are determined by the manufacturer's document and the measurement of the generator service.

Rectifier Walk-in and Charging Power

If the UPS rectifier and battery bank suddenly draw full power when the generator is activated, the generator will be loaded suddenly. UPSs therefore have a soft start feature that gradually increases the power of the rectifier. This function is also mentioned in the electrical installation manuals to prevent harmful inrush currents when the source passes into the generator.

Two settings of this feature are particularly important:

  • Soft start time: It is the time it takes for the rectifier to go from 0 percent to full power. The shorter the time, the more the frequency of the generator fluctuates.
  • Battery charging current limit: Limiting the charging current while operating in the generator reduces the generator load, especially if the battery is discharged after a discharge.

A practical result: In the event of a short outage, the battery is slightly discharged and the need for charging is small. After a long outage, the charging power increases in a short time. This charging power must be taken into account when sizing the generator. To understand the battery and charging behavior battery charging and discharging article You can read it.

Automatic transfer switch switchgear switches generator and grid supplies

Automatic Transfer Switch (ATS) and Transition Moment

When the mains is cut off, the ATS (automatic transfer switch) first starts the generator, and when the voltage and frequency of the generator are suitable, it transfers the load from the grid to the generator line. It usually takes about 10-15 seconds for the generator to start; during this time, the load is fed from the UPS battery. Therefore, the battery autonomy should easily cover this period and the time for the generator to become stable. For the actual measurement of the autonomy time UPS autonomy time test See our article.

Three details in the field regarding the moment of transition pose problems:

  • Phase sequence: If the phase sequence (rotation) is different between the mains and the generator, the bypass line is not accepted. This seems to be a frequency problem but is actually caused by the wiring.
  • Retransfer: When the grid is restored, the ATS takes the load back into the grid. Meanwhile, the UPS's grid synchronization status is restored; if the generator is free-spinning, the phase difference may increase.
  • Cooling time: The generator must operate without load for a while after the mains return; the UPS should not be reconnected to the generator line during this period.

Static transfer switch is used in architectures where the load is double-fed from two sources; details static transfer switch (STS) in our article you can find it. If two non-synchronous sources are connected to an STS, phase harmony of the sources is sought to ensure uninterrupted switching; this harmony is not automatically achieved between a free-rotating generator and a UPS fed from the grid.

Harmonics and Power Factor: The Effect That Disrupts the Voltage of the Generator

The second major source of generator problems is harmonics. Since the internal impedance of the generator is much higher than that of the mains, the disturbed current drawn by the rectifier creates a greater voltage distortion at the generator leads. The disturbed voltage waveform can cause the UPS's input monitoring circuits to read voltage incorrectly, the generator AVR to operate unsteadily, or other loads to heat up. For the basics of the subject What is harmonic to our article You can take a look.

Generator effect by rectifier type

Rectifier/inlet structureHarmonic behaviorConclusion for the generator
Six-pulse SCR rectifier, without filterThe input current contains high harmonics; it is indicated in broadcasts where unfiltered values can be highSignificant voltage breakdown in generator; large sizing allowance required
Six-pulse + passive filterThe THDi typically falls in the range of a few percent to 10 percentThe generator share decreases; however, at light load, the filter can draw capacitive current
Twelve-pulse rectifierLower harmonic, most often used in conjunction with additional filterCost and size increase; harmonic decreases
Active front-end (IGBT/PFC) rectifierThe input current is close to the sinusoidal, the power factor is highGenerator compatibility is the easiest option; usually a smaller generator is enough

One publication states that the active front-end rectifier usually does not cause harmonic or power factor problems to the generator. Another source states that the industry-accepted input THD value on large UPSs is about 7-10 percent at rated load, with most manufacturers offering filter solutions that go down to 5-7 percent. Such figures vary from manufacturer to manufacturer; refer to the THDi curve in the datasheet for your specific product.

A passive input filter also requires attention: it draws capacitive current and can load the generator with a "leading" power factor at light load. This can destabilize the generator AVR; therefore, some UPSs use contactors that disable the filter at light load. If the contactor fails, the voltage regulation of the generator may be lost. For the basic meaning of power factor power factor to our article You can look at it.

Three-phase UPS rectifier input section and input cables

Generator Sizing: Sample Calculation

It is wrong to take the rated power of the UPS only as "output kVA" in generator sizing. The input power drawn by the rectifier, battery charging power, UPS efficiency and harmonic effect are evaluated together. A numerical example:

Assumptions: 40 kVA / 36 kW (power factor 0.9) The UPS is operating at full load. The UPS efficiency is approx. 94%. The battery charging power is approx. 4 kW. The input power factor is 0.9 (with filter). There is no other load on the generator.

  1. Output power: 36 kW.
  2. Throughput: 36 / 0.94 ≈ 38.3 kW input power.
  3. Charging power is added: 38,3 + 4 ≈ 42,3 kW.
  4. Input apparent power: 42.3 / 0.9 ≈ 47 kVA.
  5. Allowance for harmonics and voltage distortion: Manufacturer calculations and on-site practices show that the generator was selected for the UPS with input filter at approximately 1.5 times the UPS rated power; for the unfiltered six-pulse rectifier, higher ratios of 2-2.5 times were used.
  6. For example: 40 × 1.5 = 60 kVA (filtered) or 40 × 2.5 = 100 kVA (unfiltered).

These figures are only orders of magnitude. Common practical formulas; rectifier power uses the generator's lower transient reactance (X"d) and acceptable voltage THD together. The typical limit for voltage THD is the range of 7-10 percent in sources and it is recommended to account for all loads of the generator. It is generally emphasized that the UPS battery charging need should also be included in generator sizing. The actual choice should be made with the joint calculation of the generator and UPS manufacturers. For UPS side calculation Our UPS power calculation article It gives basic information.

If other load is added to the generator

If the generator supplies not only the UPS but also the elevator, air conditioner, pump or lighting, the inrush currents of these loads can lower the frequency independently of the UPS. To the issue of motor loads and inrush current Motors, air conditioners and laser printers in our article We touched on it. In the field, the solution is usually the gradual commissioning of large motor loads or not being on the same line as the UPS.

Settings and Design Options That Can Be Made on the UPS Side

If the problem is caused by the UPS's setup window, the solutions are usually parameter changes from the service menu. Common topics include:

  • Expansion of the bypass frequency window: If the load can handle it, the UPS manufacturer can increase the window and frequency rate of change (slew rate) acceptance.
  • Rectifier input frequency band: A "generator mode" or a wide choice of input frequencies can be found to suit the generator application.
  • Soft start time: A longer ramp is chosen when the generator is taking the first load.
  • Charging current limit: The charging current can be reduced when the generator is running.
  • Synchronization slope: The inverter's bypass tracking speed (Hz/s) is set at the level accepted by the load. Some sources refer to typical tracking speeds as less than a few Hz per second; the actual value depends on the manufacturer.

In addition, the ability of the charging circuit to function properly even with a frequency change rate of more than 5 Hz per second is a feature sought in a generator compatible UPS. Such features should be written in the technical specification under the heading "generator compatibility" when purchasing.

Solutions that don't require bypass synchronization at all

In some designs, the UPS does not need to be synchronized to the bypass; the critical load is fed only from the UPS output, and the bypass is not used while the generator is active. In this case, the inverter is not connected to the generator's frequency, and its output runs freely, producing a constant 50 Hz. However, this risk should be considered deliberate, as automatic bypass backup cannot be used in the event of an overload or failure. The specification should have the justification for this choice written. In large systems, parallel and redundant architectures spread this risk; for details Redundancy in UPS Look.

ECO mode and transformer structure

In ECO (high efficiency) mode, the load is fed through the bypass line and the inverter is on standby. Using this mode on a volatile source such as a generator directly connects the load to the broken source; therefore, when to use it should be carefully considered (see Table 1). Our ECO mod article). On how structures with and without transformers can affect generator compatibility UPS comparison with and without transformer You can read it.

Troubleshooting: Step-by-Step Check Sequence

The following sequence is a logical flow of control that authorized personnel can monitor in the field. Opening cabinets, measurements, and setting changes are risky in energized systems; therefore, In our occupational safety article The authorities and procedures described must be followed.

  1. Get the event log: Record the clock, input frequency and voltage values in the alarm history of the UPS. Is the alarm one-time or repeats with each generator switch?
  2. Record generator frequency and voltage: Measure the lowest and highest value of the frequency during the load step; using a tape recorder is the most reliable way.
  3. Verify the phase sequence: The rotation difference between the grid and the generator can prevent bypass.
  4. Compare UPS windows: Compare the worst measured frequency value with the input and bypass windows of the UPS.
  5. Review generator settings: Contact generator service for governor type, isochrone/droop condition, AVR and governor balance.
  6. Check for soft starting: Is the time and charging current limit suitable for the generator capacity?
  7. Take the harmonic measurement: Is the voltage THD at the generator output within acceptable limits? For measurement methods Power quality measurement You can look at it.
  8. Don't forget about noise and grounding: Neutral-to-ground connection and electrical noise in the generator can affect input detection (Our EMI/RFI text).
  9. Retest after the change: Repeat scenarios for switching and returning to the generator with actual load.
Technician with safety equipment monitoring generator and UPS commissioning test

Common Mistakes and Correct Practices

Common mistakeWhy the problem?The right approach
Selecting the generator only according to the output kVA of the UPSInput power, charge and harmonic allowance remain missingInput kVA, battery charge and THD are calculated together
Performing generator testing without loadThe problem arises in the load step; no-load testing is misleadingAttempt to load the step with the actual or load bank
Extend UPS window without asking for loadFrequency-sensitive devices can be damagedDecided together with the load manufacturer and the UPS manufacturer
Leaving the rectifier soft start offGenerator is loaded suddenly, frequency fluctuatesRamp time is adjusted based on generator response
Limiting battery autonomy to generator startup timeIf the generator does not become stable, the battery will run outStart-up time, stability time and safety margin are considered together
Not associating generator maintenance with UPSGovernor and AVR setting shifts over timeGenerator and UPS maintenance are scheduled on the same schedule

If you want to clarify the difference between the role of the generator and the UPS, Differences between a UPS and a generator Our article is a good start.

Commissioning Test and What Should Be Written in the Specification

Most compliance issues can be caught during the commissioning phase. The following items can be added to the technical specification:

  • The UPS manufacturer confirms in writing that it is compatible with the generator (with generator information such as sub-temporary reactance, governor type, power).
  • Indication of input frequency range, bypass frequency window, and frequency change rate acceptance in the datasheet.
  • Adjustable rectifier soft start time.
  • Curve of the input THDi value with respect to the load ratio.
  • Application of generator switching, gradual load addition, return, and generator failure (generator stoppage) scenarios in acceptance testing.

Test records should report whether the UPS has switched to battery mode, bypass synchronization status, lowest/high value of frequency and behavior during generator return. For the scope of the test UPS initial commissioning and acceptance tests You can check our article. The effect of such strains on components throughout the life of the UPS UPS lifespan in our article you can find; In addition, continuous switching to battery mode also shortens battery life.

UPS battery cabinet and battery rows in a clean battery room

UPS Maintenance in Generator Systems

In a generator-powered UPS, the maintenance schedule should cover both sources. In periodic maintenance, warnings about generator transits should be examined in the UPS event records, and it should be checked whether the bypass and input settings are still in accordance with the actual behavior of the generator. A governor, fuel system or AVR intervention in the generator may disrupt UPS compatibility; therefore, a generator transition test is recommended after generator service.

On the battery side, switching to the generator means one small discharge and charge cycle at a time. These frequently repeated cycles wear out the battery. For the scope of regular maintenance and testing UPS periodic maintenance checklist You can use it.

The solution to the frequency and synchronization problems of the UPS in a system with a generator is usually not in a single part; it lies in handling generator adjustment, UPS parameters, wiring and sizing together. As Bempower we provide discovery, installation, periodic maintenance and technical service for all brands of UPS, battery packs and inverters, and we offer on-site support in Istanbul and surrounding provinces. If you are having problems with your UPS system working with the generator or planning a new project from the contact page You can contact us.

  1. Ensuring Generator and UPS Compatibility — EC&M (Electrical Construction &Maintenance), 2012. https://www.ecmweb.com/construction/article/20888261/ensuring-generator-and-ups-compatibility
  2. Working in Harmony: Generator and UPS Compatibility — EC&M Power Quality Magazine Archive, 2012. https://www.ecmweb.com/power-quality-magazine-archive/article/20884858/working-in-harmony-generator-and-ups-compatibility
  3. Power Protection to the Max Using Synchronized Systems — EC&M Power Quality Magazine Archive, 2012. https://www.ecmweb.com/power-quality-magazine-archive/article/20885138/power-protection-to-the-max-using-synchronized-systems
  4. Sizing Alternators for UPS Loads — IEEE Houston Section (Allen Windhorn, P.E.), 2013. https://r5.ieee.org/houston/wp-content/uploads/sites/32/2018/04/Sizing-Alternators-for-UPS-Loads_white-paper_23July13.pdf
  5. Energy Conservation Program: Test Procedure for Uninterruptible Power Supplies — Federal Register / U.S. Department of Energy, 2023. https://www.federalregister.gov/documents/2023/01/05/2022-27881/energy-conservation-program-test-procedure-for-uninterruptible-power-supplies
  6. Supplementary Specification to IEC 62040-3 AC Uninterruptible Power Systems (UPS), S-701 — IOGP JIP33, 2020. https://jip33.iogp.org/wp-content/uploads/2020/08/Supplementary-Spec-to-IEC-62040-3-AC-Uninterruptible-Power-Systems-UPS-S-701v2020-08.pdf
  7. Sizing Considerations for Commercial and Industrial Generators — Generac Industrial, 2020. https://www.generac.com/globalassets/pdfs/industrial/whitepapers/sizing-considerations-for-comm-and-ind-gens.pdf
  8. Generator Size for a UPS: kVA Ratio, Compatibility — Terex Diesel, 2026. https://terexdiesel.com/en/knowledge-centre/ups-and-generator/

Resources

Frequently Asked Questions

01Why does the UPS go into battery mode when the generator is running?
The most common cause is that the frequency or voltage of the generator goes out of the input tolerance of the UPS. The short frequency oscillation that occurs when the load is engaged causes the UPS to not accept the input and return to battery mode. The solution is usually to adjust the input frequency tolerance and bypass window wide, turn on the rectifier soft start, and check the generator regulator.
02What does the UPS cannot sync to bypass warning mean?
It means that the UPS cannot lock the inverter output to the frequency and phase angle of the bypass source. If the generator frequency changes rapidly or is outside the permitted window, this alarm is constantly seen. In this case, uninterrupted transition to bypass is not guaranteed. The setting window and the generator regulator should be evaluated together by the authorized service.
03How many times bigger should the generator be than the UPS?
There is no single exact ratio. Practical values such as approximately 2.5 times for a six-pulse rectifier without a filter and approximately 1.5-2 times for a UPS with an input filter or active rectifier are used in the sources. Actual value; It depends on the lower transient reactance of the generator, battery charging power, other loads and the UPS input THD value. Manufacturer's calculation should be consulted.
04Can the UPS input frequency tolerance be expanded?
In many professional UPSs, the input and bypass frequency window can be adjusted in the service menu. However, widening the window requires the load to be resistant to this deviation when switching to bypass. The adjustment should be made by authorized technical personnel, taking into account the values of the manufacturer of the load and the UPS manufacturer.
05What is the difference between isochrone and droop (inclined) regulation in the generator?
In isochrone mode, the governor tries to keep the frequency constant regardless of the load. In droop mode, the frequency decreases at the specified percentage as the load increases. In UPS applications powered by a single generator, isochrone or very small inclined and fast responding electronic governor is generally preferred. Adjustment should be made together with generator service.
06Why shouldn't the UPS rectifier draw full power immediately when the generator arrives?
If the rectifier suddenly draws full power, the generator is suddenly loaded; frequency and voltage drop, the UPS can switch back to battery mode. The walk-in feature gradually increases the power of the rectifier over a few seconds or tens of seconds. This helps the generator to take the load calmly.
07Will the UPS be damaged if the voltage produced by the generator is broken?
The output is usually protected because the double-conversion UPS isolates the output from the load; however, if the input voltage and frequency go out of tolerance, the UPS switches to the battery and the load shuts down when the battery expires. A broken input for a long time can also strain the rectifier and battery charging circuit. Therefore, the compatibility of the generator and the UPS should be tested at commissioning.
08What tests should I use to verify generator compatibility?
Generator commissioning and return scenarios should be tried at real load. Whether the UPS switches to battery mode, bypass synchronization alarm, frequency and voltage records, and rectifier soft start time should be monitored. Generator load changes and battery charge status should also be observed during the test.
Bempower https://www.bemenerji.com/en/blog/frequency-and-synchronization-issues-in-generator-fed-ups
Write via WhatsApp