UPS Initial Commissioning and Acceptance Tests: Pre-Delivery Checklist
A newly installed UPS must undergo measurement and functional tests before the load is connected. We explained what is checked during the initial commissioning, which tests are performed, and what documents are required upon delivery.
Read More: UPS Initial Commissioning and Acceptance Tests: Pre-Delivery ChecklistWhat is Load Bank Testing? How to Verify UPS Performance
Whether a UPS actually delivers the power on its label is only seen with the load bank without using critical loads as a test load. We have explained what is measured in the test, how it is done safely and how it differs from the discharge test.
Read More: What is Load Bank Testing? How to Verify UPS Performance