Commissioning after battery replacement: what tests are performed?
After the new batteries are installed, the connections, voltages, battery settings in the UPS and the charging voltage are checked; the first internal resistance measurement is recorded as a reference, and the transition to the battery is tried. We have explained the commissioning steps.